GL-7A2C-4419 · Bay 2 mezzanine · Camfil
Press / grind
actGold Series X-Flo · 3 mod · Stamping + grind, dry carbon steel
Gold Series serial on the Camfil file, not on the 4–20 mA.
For the desk
Filters have about 16 days.
Order 12 Gold Cone X-Flo now so they are on the floor.
Base box
Filter ΔP
3.73 in. w.c.
Changeout at 5. ~16 days.
Extra sensor
Hopper / drum
43%
Optional 4–20 mA on this panel.
Extra sensor
Compressed air
$0/mo extra
Header sensor vs this housing’s baseline.
Wired contact
Fan
Run
Dry contact. Needed before we say it ran on Sunday.
Extra sensor
Outlet dust
0.43 mg/m³
Broken-bag detector. Not a stack test.
Not from GoldLink+
Combustible
On file
DHA 2024, customer / Camfil file
Camfil file
Next media
12 × Gold Cone X-Flo
SKU GC-XF-26 · $2,136 · due 2026-09-05
We kept the frames
Last changeout on curve
2026-07-21
16 resets in two years. ΔP drop, not a work order.
Two years · weekly max ΔP
We kept the frames