Skip to content

GL-7A2C-4419 · Bay 2 mezzanine · Camfil

Press / grind

act

Gold Series X-Flo · 3 mod · Stamping + grind, dry carbon steel

Gold Series serial on the Camfil file, not on the 4–20 mA.

For the desk

Filters have about 16 days.

Order 12 Gold Cone X-Flo now so they are on the floor.

Base box

Filter ΔP

3.73 in. w.c.

Changeout at 5. ~16 days.

Extra sensor

Hopper / drum

43%

Optional 4–20 mA on this panel.

Extra sensor

Compressed air

$0/mo extra

Header sensor vs this housing’s baseline.

Wired contact

Fan

Run

Dry contact. Needed before we say it ran on Sunday.

Extra sensor

Outlet dust

0.43 mg/m³

Broken-bag detector. Not a stack test.

Not from GoldLink+

Combustible

On file

DHA 2024, customer / Camfil file

Camfil file

Next media

12 × Gold Cone X-Flo

SKU GC-XF-26 · $2,136 · due 2026-09-05

We kept the frames

Last changeout on curve

2026-07-21

16 resets in two years. ΔP drop, not a work order.

Two years · weekly max ΔP

We kept the frames

2.05.0